Play continued at the Nicklaus-designed Turtle Point Golf Course throughout work

Play continued at the Nicklaus-designed Turtle Point Golf Course throughout work

img_1398

Play continued as we inflated our dams in the greenside pond.

Play continued as we inflated our dams in the greenside pond.

One of the greenside sinkholes that alerted everyone involved to the problem.

One of the greenside sinkholes that alerted everyone involved to the problem.

A series of sinkholes like this appeared beside the green

A series of sinkholes like this appeared beside the green

We installed dams to dewater the work area and the pipes

We installed dams to dewater the work area and the pipes

As we dewatered, we saw that the bottom halves of the pipes no longer existed

As we dewatered, we saw that the bottom halves of the pipes no longer existed

The inverts were completely gone

The inverts were completely gone

The brackish water had completely eaten the bottom halves of the CMP installed in the mid '80s

The brackish water had completely eaten the bottom halves of the CMP installed in the mid ’80s

Dewatered work area

Dewatered work area

Bottom of pipes nonexistent

Bottom of pipes nonexistent

img_1414

The years of infiltration into the pipes had left the pipes about half full of dirt

The years of infiltration into the pipes had left the pipes about half full of dirt

No pipe bottoms

No pipe bottoms

img_1418 img_1424 img_1426

This was a piece of the pipe that we cut off to keep as a trophy

This was a piece of the pipe that we cut off to keep as a trophy

Sediment removed from pipes.

Sediment removed from pipes.

Play continued for the duration of the job.

Play continued for the duration of the job.

We pumped H-100 hydroactive grout to stop infiltration, fill voids, and stabilize pipe

We pumped H-100 hydroactive grout to stop infiltration, fill voids, and stabilize pipe

The H-100 hydroactive grout filled the voids behind the pipe then came through the holes in the pipe where we contained it and allowed it to build strength

The H-100 hydroactive grout filled the voids behind the pipe then came through the holes in the pipe where we contained it and allowed it to build strength

Containing H-100 at the hole in the pipe to allow it to fill void around pipe and stabilize soils around pipe

Containing H-100 at the hole in the pipe to allow it to fill void around pipe and stabilize soils around pipe

A clearly visible row of holes at the spring line existed - we filled those holes and the voids they created

A clearly visible row of holes at the spring line existed – we filled those holes and the voids they created